The ESTHER hosting laboratory is at last ready! Only some minor works remain to be done, such as the painting of the technical floor panels, as well as the testing of the electrical and ventilation equipments,
Please join us in a little walktrough on the building interior, before it is filled with the corresponding scientific equipment!

Dump Tank and Gas Bottles rooms

Door to the Experimental Hall

Experimental Hall view (1/2)

Experimental Hall view (2/2)

Technical Room view (1/2)

Technical Room view (2/2)

Bathroom view

Preparation Room view (1/2)

Preparation Room view (2/2)

Control Room view (1/2)

Control Room view (2/2)

Meeting Room view

Entry Corridor view (1/2)

Entry Corridor view (2/2)

Main Building Entry

View of the Building Rooftop
Ricardo Reis says:
Está a ficar bonito, sim senhora!
esther_blog says:
Ha! First post as they say!
Obrigado pelo comment, temos condições para fazer um bom trabalho
M. Madruga says:
Congratulations on another decisive milestone =)
esther_blog says:
Thank you Miguel! Looking forward to have you onboard soon if you want to do some research with us.
M. Madruga says:
Also looking forward to future challenges with the ESHTER team, who is aiming vigorously to the skies. As in the words of S. P. Korolev: “The road to the stars is open”.